Industrial fitting new works /Industrial Maintenance works
Studies of digrams procedures
Schematiszation of electric fittings
Schematiszation of mechanical fittings
Schematisaztion of piping fittings and tools Schematisztion of industial manifactures procedures Building details studies Availabily of drawers Existing fitting plans up dating Realization of details plans thanks to a basics analysis Changes complete studies Electic fittings
Mechanical fittings
Metal structures and framework
Fluid circulation fittings
Planners availibility (level 4 and 3)
Complete study thanks to basis diagrams
Work notebook and building specification realization
Preparation to maintenance management Fittings synoptically diagrams conception
Equipment technical forms conception
Schedules conception General schedule
Carrying out general schedule
Details schedule Works following up methods Planners availability
Supplies
Raw materials recetion and follozing up of orders
Prefabrication
Preparation and manufacture steps following up
Preparation and assembling steps following up
Assembling
Preparation and works reception steps following up
Preparation and works availability steps following up
Work Supervision Work Supervision
End of business file
|